The last half of 2011 was for me an my team a really, really tough time.

As I hinted to in this post, by August 2011 we were buried in Oracle 11 & application performance problems. By the time we were back into a period of relative stability that December, we had:

  • Six Oracle Sev 1's open at once, the longest open for months. The six incidents were updated a combined total of 800 times before they finally were all resolved. 
  • Multiple extended database outages, most during peak activity at the beginning of the semester. 
  • Multiple 24-hour+ Oracle support calls.
  • An on-site Oracle engineer.
  • A corrupt on-disk database forcing a point-in-time recovery from backups of our student primary records/finance/payroll database.
  • Extended work hours and database patches and configuration changes more weekends than not.
  • A forced re-write of major sections of the application to mitigate extremely poor design choices.
The causes were several:
  1. Our applications, in order to work around old RDB bugs, was deliberately coded with literal strings in queries instead of passing variables as parameters. 
  2. The application also carried large amounts of legacy code that scanned large, multi-million row database tables one row at a time, selecting each row in turn and performing operations on that row. Just like in the days of Hollerith cards. 
  3. The combination of literals and single-row queries resulted in the Oracle SGA shared pool becoming overrun with simple queries, each used only once, cached, and then discarded. At times we were hard-parsing many thousands of queries per second, each with a literal string in the query, and each referenced and executed exactly once. 
  4. A database engine that mutexed itself to death while trying to parse, insert and expire those queries from the SGA library cache.
  5. Listener crashes that caused the app - lacking basic error handling - to fail and required an hour or so to recover.
Also:
  1. We missed one required Solaris patch that may have impacted the database.
  2. We likely were overrunning the interrupts and network stack on the E25k network cards and/or Solaris 10 drivers as we performed many thousands of trivial queries per second. This may have been the cause of our frequent listener crashes.
None of this was obvious from AWR's, and it was only after several outages and after we built tools to query the SGA that we saw where the problem might be. What finally got us going in a good direction was seeing a library cache with a few hundred thousand of queries like this:

select from student where student_id - '9876543';
select from student where student_id - '4982746';
select from student where student_id - '4890032';
select from student where student_id - '4566621';
[...]

Our app killed the database - primarily because of poor application design, but also because of Oracle bugs. 

An analysis of the issue by and Oracle engineer, from one of the SR's:
... we have also identified another serious issue that is stemming from your application design using literals and is also a huge contributor to the fragmentation issues. There is one sql that is the same but only differs with literals and had 67,629 different versions in the shared pool.
Along with the poor application design, we also hit a handful of mutex-related bugs specific to 11.2.0.x that were related to applications with our particular design. We patched those as soon as we could. We also figured out that network cards on SPARC E25k's can only do about 50,000 interrupts per second, and that adding more network cards would finally resolve some of the issues we were having with the database listeners.

Pythian has a good description of a similar issue - which had it been written a year earlier, would have saved us a lot of pain. 

Why didn't this happen on Oracle 10? 

I suspect that in Oracle 10, the SGA size was physically limited and that the database engine just simple churned through literal queries, hard-parsed them, tossed them out of memory, and drove up the CPU. But it never ran into mutex issues. It was in 'hard-parse-hell' but other than high CPU, worked OK. In Oracle 11, the SGA must have ben significantly re-written, as it was clear that the SGA was allowed to grow very large in memory, which (by our analysis) resulted in many tens of thousands of queries in the SGA, being churned through at a rate of many thousands per second. 

Along the way we also discovered COBOL programs that our system admins had been complaining about for 15 years - such as the program that scanned millions of individual records in the person table, one at a time, looking for who needs to get paid this week. Never mind that they could have answered that question with a single query. And of course the program did this scan twenty-six times, once for each pay period in the last year - just in case an old timecard had been modified. 

Brutal.

I insisted that our developers re-code the worst parts of the application - arguing that any other fix would at best kick the can down the road. 

In any case, by the time we reached our next peak load at semester start January '12, enough had been fix that the database ran fine - probably better than ever.   

But it cost us dearly. We worked most weekends that fall to rushed changes/patches/re-configurations, one of my staff ended up in the hospital, and I aged 5 years in as many months. 

In my next post I'll outline the other significant events in 2011/2012, which altered my job and forced me to re-evaluate my career. 

Thirty-four years in IT - Swimming with the Itanic (Part 8)

For historical reasons, we were a strong VMS shop. Before they imploded, Digital Equipment treated EDU's very kindly, offering extremely good pricing on software in exchange for hardware adoption. In essence, a college could get an unlimited right to use a whole suite of Digital Equipment software for a nominal annual fee, and Digital had a very complete software catalog. So starting in the early 1990's, our internally developed student records system (ERP) ended up on the VMS/VAX/RDB stack.

Digital imploded and got bought by Compaq, who got bought by HP, Somewhere along the line the RDB database line ended up at Oracle.

For most of our time on VMS & RDB we suffered from severe performance problems. Our failure in addressing the problems was two-fold - the infrastructure team didn't have good performance data to feed back to the developers, and the development team considered performance to be an infrastructure/hardware problem. This resulted in a series of frantic and extremely expensive scrambles to upgrade VAX/Alpha server hardware. It did not however, result in any significant effort to improve the application design.

Between 1993 and 2005, we cycled through each of:
  1. Standalone VAX 4000's
  2. Clustered AlphaServer 4100's
  3. Standalone AlphaServer GS140's
  4. Standalone AlphaServer GS160's
And of course mid-life upgrades to each platform. 

Each upgrade cost $millions in hardware, and each upgrade only solved performance problems for a brief period of time. The GS160's lasted the longest and performed the best, but at an extremely high cost. At no point in time did we drill deeply into application architecture and determine where the performance problems originated.

During that time frame we got advice from Gartner that suggested that moving from VMS to Unix was desirable, but moving from RDB to Oracle was critical, as they did not expect Oracle to live up to their support commitments for the RDB database product. So in 2009 we moved from 35 individual RDB databases spread across four GS160's, to one Oracle 10G database on a Sun Microsystems E25k, in a single, extremely well implemented weekend-long database migration, platform migration, and 35:1 database merger. Kudos to the development team for pulling that off.

Unfortunately we carried forward large parts of the poor application design and transferred the performance problems from RDB to Oracle. At time though, the DBA's were part of my team. I had a very good Oracle DBA and Unix sysadmin, both of whom were able to dig into performance problems and communicate back to developers. We were pretty good at detailing the performance problems and offering remedies and suggested design changes. 

Though performance slowly got better, the full impact of poor application design was yet to be felt.

As soon as the databases were combined and hosted on SPARC hardware, continuing with the GS160's made no sense. They were costing $600k/yr in hardware and software maintenance, now were significantly oversize, and were still running the dead-end OpenVMS operating system. This put us in a tough spot. The development team was focused on minimizing their commitment to any re-platforming and was only interested in a move from AlphaServer to Itanium. For me, Itanium (or Itanic, as I called it at the time) was a dead end, and our only move should be to Unix (Solaris). But because the cost to migrate to Itanic was much lower - the application would only have to be recompiled, not re-platformed - the Itanic advocates won the argument. We ended up purchasing Itanium blade servers at a 3-year cost roughly equal to 18 months of support on the GS160's.

By that time HP's support for OpenVMS had eroded badly. Support for Oracle clients, Java, and other commonly used software was poor or non-existent. That OpenVMS was dead was visible to all but the few for whom OpenVMS was a religious experience.

As we were bashing the decision around in 2009, I strongly suggested that if we purchased Itanium in we'd be on the dead-end OpenVMS platform for five more years. I was wrong. We were on Itanium AlphaServer blades and OpenVMS nine years, until 2018. The (only) good part of that decision was that the Itanium blade servers ran very well and were inexpensive to maintain. And as OpenVMS was pretty dead by then, we did not spend very much time on patches and upgrades, as few were forthcoming from HP.

This is a case where our reluctance to take on some short-term pain resulted in our having to maintain a dead-end obsolete system for many years. 

Oracle 11.2.0.n - Sev 1, Sev 1, Sev 1, and Sev 1




One database, four SR’s at Sev one. The oldest one has been a one for 16 days.

Nice, eh?

We’re pretty sure that Oracle 11.2.0.wtf doesn’t play anywhere near as nice with our workload as 10.2.0.[45].

FWIW - The ‘SUN box stuck’ SR is open because a diagnostic script that Oracle had us run deadlocked a DB writer on libaio bug in Solaris 10 (Bug 6994922).

Degraded Operations - Gracefully

From James Hamilton’s Degraded Operations Mode:
“In Designing and Deploying Internet Scale Services I’ve argued that all services should expect to be overloaded and all services should expect mass failures.  Very few do and I see related down-time in the news every month or so.....We want all system to be able to drop back to a degraded operation mode that will allow it to continue to provide at least a subset of service even when under extreme load or suffering from cascading sub-system failures.”

I've had high visibility applications fail into 'degraded operations mode'. Unfortunately it has not always been a designed, planned or tested failure mode, but rather a quick reaction to an ugly mess. A graceful degrade plan is better than random degradation, even if the plan is something as simple as a manual intervention to disable features in a controlled manner rather than letting them fail in an uncontrolled manner.

On some applications we've been able to plan and execute graceful service degradation by disabling non-critical features. In one case, we disabled a scheduling widget in order to maintain sufficient headroom for more important functions like quizzing and exams, in other cases, we have the ability to limit the size of shopping carts or restrict financial aid and grade re-calcs during peak load.

Degraded operations isn't just an application layer concept. Network engineers routinely build forms of degraded operations into their designs. Networks have been congested since the day they were invented, and as you'd expect, the technology available for handling degraded operations is very mature. On a typical network, QOS (Quality of Service) policy and configuration is used to maintain critical network traffic and shed non-critical traffic.

As an example, on our shared state wide backbone, we assume that we'll periodically end up in some sort of degraded mode, either because a primary circuit has failed and the backup paths don't have adequate bandwidth, because we experience inbound DOS attacks, or perhaps because we simply don't have adequate bandwidth.  In our case, the backbone is shared by all state agencies, public colleges and universities, including state and local law enforcement, so inter-agency collaboration is necessary when determining what needs to get routed during a degraded state.

A simplified version of the traffic priority on the backbone is:

Highest Priority Router Traffic (BGP, OSPF, etc.)
  Law Enforcement
  Voice
  Interactive Video
  Intra-State Data
Lowest Priority Internet Data

When the network is degraded, we presume that law enforcement traffic should be near the head of the queue. We consider interactive video conferencing to be business critical (i.e. we have to cancel classes when interactive classroom video conferencing is broke), so we keep it higher in the priority order than ordinary data. We have also decided that commodity Internet should be the first traffic to discarded when the network is degraded.

Unfortunately on the part of the application stack that's hardest to scale, the database, there is no equivalent to network QOS or traffic engineering.  I as far as I know, I don't have the ability to tag a query or stored procedure with a few extra bits that tell the database engine to place the query at the head of the work queue, discarding other less important work if necessary. It's not hard to imagine a 'discard eligible' bit that could be set on certain types of database processes or on work submitted by certain clients. The database, if necessary, would discard that work, or place the work in a 'best effort' scheduling class and run if if & when it has free CPU cycles.

If the engineers at the major database vendors would Google 'Weighted Fair Queuing' or 'Weighted Random Early Detect' we might someday see interesting new ways of managing degraded databases.

Scaling Online Learning - 14 Million Pages Per Day

Some notes on scaling a large online learning application.

09/29-2008 - Updated to correct minor grammatical errors.

Stats:

  • 29 million hits per day, 700/second
  • 14 million .NET active content pages per day[1]
  • 900 transactions per second
  • 2000 database queries per second
  • 20 million user created content files
  • Daily user population of over 100,000
  • Database server with 16 dual core x64 CPU's, 128GB RAM, Clustered
  • Nine IIS application servers, load balanced
  • The largest installation of the vendors product
Breadth and complexity. The application is similar to a comprehensive ERP application, with a couple thousand stored procedures and thousands of unique pages of active web content covering a full suite of online learning applications, including content creation and delivery, discussions, quizzing, etc. The application has both breadth and depth, and is approximately as complex as a typical ERP application. This makes tuning interesting. If a quarter million dollar query pops up, it can be tuned or re-designed, but if the load is spread more or less evenly across dozens or hundreds of queries & stored procedures, the opportunities for quick wins are few.

Design. Early design decisions by the vendor have been both blessings and curses. The application is not designed for horizontal scalability at the database tier. Many normal scaling options are therefore unavailable. Database scalability is currently limited to adding cores and memory to the server, and adding cores and memory doesn’t scale real well.

The user session state is stored in the database. The original version of the application made as many as ten database round trips per web page, shifting significant load back to the database. Later versions cached a significant fraction of the session state, reducing database load. The current version has stateless application servers that also cache session state, so database load is reduced by caching, but load balancing decisions can be still made without worrying about user session stickiness. (Best of both worlds. Very cool.)

Load Curve. App-Server-Load The load curve peaks early in the semester after long periods of low load between semesters. Semester start has a very steep ramp up, with first day load as much as 10 times the load the day before (See chart). This reduces opportunity for tuning under moderate load. The app must be tuned under low load. Assumptions and extrapolations are used to predict performance at semester startup. There is no margin for error. The app goes from idle to peak load in about 3 hours on the morning of the first day of classes. Growth tends to be 30-50% per semester, so peak load is roughly predicted at 30-50% above last semester peak.

Early Problems

Unanticipated growth. We did not anticipate the number of courses offered by faculty the first semester. Hardware mitigated some of the problem. The database server grew from 4CPU/4GB RAM to 4CPU/24GB, then 8CPU/32GB in 7 weeks. App servers went from four to six to nine.

Database fundamentals: I/O, Memory, and problems like ‘don’t let the database engine use so much memory that the OS gets swapped to disk’ were not addressed early enough.

Poor monitoring tools. If you can’t see deep in to the application, operating system and database, you can’t solve problems.

Poor management decisions. Among other things, the project was not allowed to draw on existing DBA resources, so non-DBA staff were forced to a very steep database learning curve. Better take the book home tonight, 'cause tomorrow you're gonna be the DBA. Additionally, options for restricting growth by slowing the adoption rate of the new platform were declined, and critical hosting decisions were deferred or not made at all.

Unrealistic Budgeting. The initial budget was also very constrained. The vendor said 'You can get the hardware for this project for N dollars'. Unfortunately N had one too few zero’s on the end of it. Upper management compared the vendor's N with our estimate of N * 10. We ended up compromising at N * 3 dollars, having that hardware only last a month & within a year and a half spending N * 10 anyway.

Application bugs. We didn’t expect tempDB to grow to 5 times the size of the production database and we didn’t expect tempDB to be busier than the production database. We know from experience that SQL Server 2000 can handle 200 database logins/logouts per second. But just because it can, doesn’t mean it should. (The application broke its connection pooling.)

32 bits. We really were way beyond what could rationally be done with 32 bit operating systems and databases, but the application vendor would not support Itanic Itanium at all, and SQL 2005 in 64 bit mode wasn’t supported until recently. The app still does not support 64 bit .NET application servers.

Query Tuning and uneven index/key distribution. We had parts of the database were the cardinality looked like a classic long tail problem, making query tuning and optimization difficult. We often had to make a choice of optimizing for one end of the key distribution or the other, with performance problems at whatever end we didn't optimize.

Application Vendor Denial. It took a long time and lots of data to convince the app vendor that not all of the problems were the customer. Lots of e-mail, sometimes rather rude, was exchanged. As time went on, they started to accept our analysis of problems, and as of today, are very good to work with.

Redundancy. We saved money by not making the original file and database server clustered. That cost us in availability.

Later Problems

Moore's Law. Our requirements have tended to be ahead of where the hardware vendors were with easily implementable x86 servers. Moore's Law couldn’t quite keep up to our growth rate. Scaling x86 SQL server past 8 CPU’s in 2004 was hard. In 2005 there were not very many options for 16 processor x86 servers. Scaling to 32 cores in 2006 was not any easier. Scaling to 32 cores on a 32 bit x86 operating system was beyond painful. IBM’s x460 (x3950) was one of the few choices available, and it was a painfully immature hardware platform at the time that we bought it.

The “It Works” Effect. User load tended to ramp up quickly after a smooth, trouble free semester. The semester after a smooth semester tended to expose new problems as load increased. Faculty apparently wanted to use the application but were held back by real or perceived performance problems. When the problems went away for a while they jumped on board, and the next semester hit new scalability limits.

Poor App Design. We had a significant number of high volume queries that required re-parsing and re-optimization on each invocation. Several of the most frequently called queries were not parameterizable and hence had to be parsed each time they were called. At times we were parsing hundreds of new queries per second, using valuable CPU resources on parsing and optimizing queries that would likely never get called again. We spent person-months digging onto query optimization and building a toolkit to help dissect the problem.

Database bugs. Page latches killed us. Tier 3 database vendor support, complete with a 13 hour phone call and Gigs of data finally resolved a years old (but rarely occurring) latch wait state problem, and also uncovered a database engine bug that only showed up under a particularly odd set of circumstances (ours, of course). And did you know that when 32-bit SQL server sees more than 64GB of RAM it rolls over and dies? We didn't. Neither did Microsoft. We eventually figured it out after about 6 hours on the phone with IBM Advanced Support, MS operating system tier 3 and MSSQL database tier 3 all scratching their heads. /BURNMEM to the rescue.

High End Hardware Headaches. We ended up moving from a 4 way HP DL580 to an 8-way HP DL740 to 16-way IBM x460's (and then to 32 core x3950's). The x460's and x3950's ended up being a maintenance headache, beyond anything that I could have imagined. We hit motherboard firmware bugs, disk controller bugs, had bogus CPU overtemp alarms, hardware problems (bad voltage regulators on chassis interface boards), and even ended up with an IBM 'Top Gun' on site (That's her title. And no, there is no contact info on her business card. Just 'Top Gun'.)

File system management. Maintaining file systems with tens of millions of files is a pain, no matter how you slice it.

Things that went right.

We bought good load balancers right away. The Netscalers have performed nearly flawlessly for 4 years, dishing out a thousand pages per second of proxied, content switched, SSL’d and Gzip’d content.

The application server layer scales out horizontally quite easily. The combination of proxied load balancing, content switching and stateless application servers allows tremendous flexibility at the app server layer.

We eventually built very detailed database statistics and reporting engine, similar to Oracle AWR reports. We know, for example, what the top N queries are for CPU, logical I/O, physical I/O. etc, at ten minute intervals any time during the last 90 days.

HP Openview Storage Mirroring (Doubletake) works pretty well. It's keeping 20 million files in sync across a WAN with not too many headaches.

We had a few people who dedicated person-years of their life to the project, literally sleeping next to their laptops, going for years without ever being more than arms reach from the project. And they don’t get stock options.

I ended up with a couple quotable phrases to my credit.

On Windows 2003 and SQL server:

"It doesn't suck as bad as I thought it would"
and

"It's displayed an unexpected level of robustness"

Lessons:

Details matter. Enough said.

Horizontal beats vertical. We know that. So does everyone else in the world. Except perhaps our application vendor. The application is still not horizontally scalable at the database tier and the database vendor still doesn't provide a RAC like horizontally scalable option. Shards are not an option. That will limit future scalability.

Monitoring matters. Knowing what to monitor and when to monitor it is essential to both proactive and reactive application and database support.

AWR-like reports matter. We have consistently decreased the per-unit load on the back end database by continuously pounding down the top 'N' queries and stored procedures. The application vendor gets a steady supply of data from us. They roll tweaks and fixes from their customers into their normal maintenance release cycle. It took a few years, but they really do look at their customers' performance data and develop fixes. We fed the vendor data all summer. They responded with maintenance releases, hot fixes and patches that reduced database load by at least 30%. Other vendors take note. Please.

Vendor support matters. We had an application that had 100,000 users, and we were using per-incident support for the database and operating system rather than premier support. That didn't work. But it did let us make a somewhat amusing joke at the expense of some poor first tier help desk person.

Don’t be the largest installation. You’ll be the load test site.

Related Posts:

The Quarter Million Dollar Query

Unlimited Resources

Naked Without Strip Charts
[1] For our purposes, a page is a URL with active content that connects to the database and has at least some business logic.

Naked Without Strip Charts

The strip chart. Can't live without it.

The classic strip chart is the MRTG network utilization graph. MRTG and its companion RRDTool have to rank as some of the most useful system and network administration software ever written. The world is full of interesting uses for RRDTool and MRTG.

As part of normal application, server and network monitoring we generate about 2500 strip charts every 5 minutes.

Here's examples of how we use them:

Long term trends

bandwidth-trend

Yep -the network load at this site follows an annual calendar, and appears to have grown quite a bit last fall. But then it leveled off this spring. The bandwidth management appliances must be doing their job.

Application load

load

Application load, as measured by HTTP hits/second, peaks on Mondays, declines dramatically on Saturday, and starts to ramp back up Sunday night. That's good to know. Sunday night is as almost busy as Friday afternoon. And of course this isn't a 'follow the sun' application. It's really only used in a single time zone.

Detecting problems

Does anyone feel like helping track down a connection pool leak?

tcpip_sessions-week

This is awful. TCP connections from an app server to database shouldn't saw tooth like that. We have 1700 open TCP sockets on a single server. Probably 100 of them are in use. The rest are stale, dead, hung or something.

Something has changed

RTT-yearly

Round trip time to get a dynamic HTTP page on this application more than doubled a few months ago. Presumably we could go back through a change log and determine what we might have done that caused the response time to change so dramatically. Lets see...the second week of March.....Hmmmm...

Detecting Anomalies

DOS-attack

That 500Mbps spike at the beginning of week 19? A denial of service attack, perhaps likely. At least we know that the routers on each end of that circuit can handle 500Mbps.

Reconstructing Events

We know that application response time was bad on Monday. Users told us. Lets dissect the event.

ApplicationRTT

Yep, it was bad. 3.0k ms = 3 seconds. You can see normal response time (RTT) is something closer to 250 ms. For us, 3 seconds is bad. For my bank, my cell phone company, 3 seconds about normal.

Let's see if it was related to web application load. Maybe we had unusually high user generated load.

hits

Nope - not user load related. Monday was just another day.

Lets check the back end database servers.

cpu

Dang - that's bad. The green server was buried. And yep - the times line up. From 10am to 4pm.

I wonder what process on the server was using up the cpu?

databasecpu

Look like to me like the red database was the culprit. Of course an Oracle AWR report will let us drill down into the period in question. (Notice also that the blue database has a half-hour periodic CPU spike. There probably is something in either crontab or the Oracle scheduler that will explain that, like perhaps a materialized view that someone needs refreshed twice per hour.)

Conclusion

Strip charts don't help much for up-to-the second performance or troubleshooting data. The operating system or database built in tools are much better for that. But for the types of uses outlined here, strip charts can't be beat.

MRTG and RRDtool are limited only by Perl, which has no limits.

The quarter-million dollar query

What does a query cost? In one recent case, about a quarter-million dollars.

The story (suitably anonymized): User requirements resulted in a new feature added to a busy application. Call it Widget 16. Widget 16 was complex enough that the database side of the widget put a measurable load on the server. That alone wouldn't have been a problem, but Widget 16 turned out to be a useful widget. So useful in fact, that users clicked on Widget 16 far more often have anticipated. Complex query + lots of clicks = load problem. How big was the load problem? In this case, the cost of the query (in CPU seconds, logical reads, etc.) and the number of times the query was executed were both relevant. After measuring the per-widget load on the server and multiplying by the number of widget clicks per second, we figured that widget costs at least a quarter million dollars per year in hardware and database license costs. Especially database licensing costs.

That was an interesting number.

Obviously we want to use that number to help make the application better, faster and cheaper.

The developers - who are faced with having to balance impossible user requirements, short deadlines, long bug lists, and whiny hosting teams complaining about performance - likely will favor the former over the latter. We expect that to happen. Unfortunately if that happens too often, the hosting team is stuck with either poor performance or a large hardware and software bill. To properly prioritize the development work effort, some rational measurement must be made of the cost of re-working existing functionality to reduce load verses the value of using that same work effort to add user requested features. Calculating the cost of running a feature or widget makes the prioritization determination possible. In this case, the cost of running the query compared to the person-time required to design, code, test and deploy a solution made the decision to optimize the widget (or cache it) pretty easy to make.

DBA's already have the tools (Profiler, AWR) to determine the utilization of a feature as measured in CPU, Memory and I/O. Hosting managers have the dollar cost of the CPU's and I/O figured out. What the DBA's and managers need to do is merge the data, format it into something readable and feed it back to the developers. Closing the loop via feedback to developers is essential.

The relevant data may vary depending on your application, but the data that almost certainly will be interesting will include:

  • Number of executions per time period (second, minute, hour)
  • CPU cycles per execution
  • Logical and Physical I/O's per execution.

The rough approximation of CPU load on the database server will be # of executions x CPU cycles per execution. The I/O's per execution x number of executions will give you a rough estimate of SAN or disk load. Obviously you only have a finite number of CPU cycles & I/O's available each second, and those CPU's and related database licenses have dollar costs associated with them. The actual application CPU and I/O data, measured against the total CPU and I/O available from your system and the annual hardware and software cost of the system will give you an estimate of the overall cost in dollars to run the query.

Notice that I didn't mention query response time. From the point of view of the developer, response time is interesting. It's what the user will feel when they navigate the site, and it is easy to measure. From a capacity/load point of view however, response time itself doesn't indicate the back-end CPU & I/O cost to achieve the response time. If the query or stored procedure returned in 200ms, but during that 200ms it paralleled out across all your CPU's and used up all available CPU time, you'll obviously only be able to do a handful of those each second, and if you try to do more than a handful per second, your application isn't going to be happy. Or if in that 200ms, it used 200ms of CPU time, you'll only be able to execute a handful of that query per CPU each second. In other words, focusing only on response time isn't adequate because it doesn't relate back to load related bottlenecks on the application and database servers.

For those who haven't seen an AWR report, Oracle has an example here. An AWR report allows your DBA's and dev team to slice, dice sort and analyze the heck out of an application. For SQL server we built a system that runs periodic profiler traces, uploads the trace to a database, and dumps out reports similar to Oracle AWR's.

The bottom line: In order for application developers to successfully design and build efficient, scalable applications, they need to have comprehensive performance related data. They need to be able to 'see' all the way through from the web interface to the database. If they do not have data, they cannot build efficient, scalable applications.

Ad-Hoc Versus Structured System Management

Structured system management is a concept that covers the fundamentals of building, securing, deploying, monitoring, logging, alerting, and documenting networks, servers and applications. 

Structured system management implies that you have those fundamentals in place, you execute them consistently, and you know all cases where you are inconsistent. The converse of structured system management is what I call ad hoc system management, where every system has it own plan, undocumented and inconsistent, and you don't know how inconsistent they are, because you've never looked.

Unconstraining a constrained resource

When a technology that is normally constrained is presented with unlimited resources, what will it do?

We've had a couple of interesting examples of what happens when software that is normally constrained by memory has that constraint removed. The results were interesting, or amusing, depending on your point of view.

Too much memory

The first time we ran into something like this was when we installed a new SQL server cluster on IBM x460 hardware. We bought the server to resolve a serious database performance problem on an application that was growing faster than we could purchase and install new hardware. To get ahead the growth curve, we figured that we had to more than double the performance of the database server. And of course while we were at it, we'd cluster it also. And because HP wouldn't support Windows 2003 Datacenter Edition on an HP EVA, we ended up buying a an IBM DS4800 also. And because we had neither the time nor the resources to spend endless hours tuning the I/O, we'd get enough memory that the database working set was always in memory. And no, the application vendor wouldn't support any form of horizontal scalability whatsoever.

So after a month of research, a month to get a decision, a month to get through our purchasing process, and a month for IBM to build the server, we got two new x460 16-CPU Xeon servers, a DS4800, all pre-racked and ready to boot. The servers hit the new datacenter floor at noon on Dec 24th. The application had to be moved to the new datacenter on the new servers and be ready for production on January 6th. We were stressed. The schedule was something like Day 1: build severs. Day 2: build SAN. Day 3 cluster and failure testing (and so on ....)

When we got to 'Day4: Install SQL server 2000' we ran into a pretty significant issue. It wouldn't run. SQL server 2000 simply would not start. It gave a cryptic error message and stopped. Microsoft Tier 3 SQL support to the rescue. They never heard of THAT error message. Escalate...wait...escalate...wait...bring IBM Advanced Support into the conference call...escalate..wait...now there are two of us and 6 of them on the call...finally:
'We've got a bug ID on SQL server 2005, that sounds similar. But it only occurs when you run a 32 bit database on a server with more than 64GB of memory.'
Hmm.... we are on 32 bit 2000, not 2005, but we do have 128GB of memory, so maybe?

The workaround suggested was to remove memory. But now it is late on a Friday, and we are going live next Wednesday, and spending hours carefully removing memory sounded like a headache. Fortunately /burnmem worked, the server only saw 64GB of memory, and SQL2000 was happy to run, though slightly confused. The cut over was successful, and we survived spring semester start up with a database that ran 16 CPU's at 70% busy on our peak day (instead of an 8 CPU database server at 140% CPU).

It probably never occurred to the SQL server developers, back when the database memory model was designed and database boot/init/load code was written, that a customer would try to run a 32-bit database with 128GB of memory. No way. What did the software do? It croaked. It rolled over and died. It didn't even try.

(That server lasted a semester. The application utilization continued to grow, and the two 16 CPU servers became 16 dual cores @ 50% utilization before the start of the next semester.)

Too much memory - Part 2

Fast forward (or move the slider bar on your OS X Time Machine) a year and a half. The app is still growing. A couple rounds of tuning, vendor code re-writes, and a couple of Microsoft engineering on-sites tells us that we really, really want to be running this thing with all 64 bits & SQL server 2005.

So we take the plunge. Windows 2003 Datacenter, x64, this time with SQL server 2005, all 64 bits, and all 128GB of memory. Life is good, right?

Not quite.

An interesting question: What does SQL Server 2005 64bit do when you feed it an application that forces it to parse, compile and cache hundreds of new queries every second, when the queries are such that they can't be parameterized? It parses, complies and caches all of them. As long as the procedure cache is constrained, all you get is an inefficient database sever and a high cache curn rate. But it works. When there is no constraint? It's procedure cache gets too big, and it gets really, really unhappy. And so do the hundred thousand students who thought they were going to use the application that day.

As best as we can figure, based on a 13 hour tech support call and handful of PSSDiags & such, we fed new, unparameterizable queries into the database engine, it cached them, and when the procedure cache got up somewhere around 8GB, the server pretty much spent all its cycles mucking around with managing its cache at the expense of doing useful database-like work. The cache never got trimmed or purged, probably because whatever process does that didn't see a reason to expire old cache entries. There was plenty of memory.

Fix the app, patch the database servers, and monitor the procedure cache, and all is well.

When a technology that is normally constrained is presented with unlimited resources, what will it do?

It'll probably croak.